X

Placement of solar racking

May 30, 2008 by Metalab Admin

Digitally fabricated solar racking on top of the sales office container. Dry fitting the assembly before powder coating. That's Matt and Bob of Merge leading the assembly and install.


Horizon Twin Groves Wind Farm LOOKOUT

May 29, 2008 by Metalab Admin

We've been working with Ttweak to develop public landscapes for Horizon Wind Energy. The first one at their wind farm in central Illinois has recently been completed.


Mirabeau B Sales Center

May 29, 2008 by Metalab Admin

We are working with Harvest Moon Development, Ttweak and Merge Studios to design, fabricate and install a Sales Center for the proposed Mirabeau B Condominium project.


Round Pen, winner of a Houston AIA Design Award, featured in Houston Chronicle

May 07, 2008 by metalab

Lisa Gray of the Houston Chronicle reports on the 2008 American Institute of Architects:Houston Design Awards, noting the prevalence of "little projects with big ambitions." Round Pen was one of the winning designs for this year.  


The Grotto meets its site…

May 03, 2008 by Metalab Admin

The model (25% of actual size) was placed on the slab that had been cut and diamond polished in time for our review.


Final Review at UHcoA

May 03, 2008 by Metalab Admin


Fabrication Day 2 (Shell Completed)

May 03, 2008 by Metalab Admin

The shell goes together on ONE DAY with some first time welders.