Canopy installation

The Austin Training Pavilion canopy was installed in an hour by the landscape crew (no steel erection subs necessary!).  A wide load left Houston at 9am and met the crane on site.  Lifting lugs included in the pre-fabricated assembly were used to hoist the entire assembly into place on its four 9′ columns.  The beautiful Texas sun animated the waterjet cut suspended panels immediately.  Showers, fans and site work are all that remain.

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment