Open Channel Flow is out of the ground

The foundation (3 pier footings) for the Open Channel Flow sculpture have been placed.  The assembly shown is the jig that Campo Sheet Metal built to locate the bolt plates on which the pipe work will be installed.

ocf_03

rendering-copy

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment